Chwilio'r wefan
English

Cau ffyrdd dros dro

Cau ffyrdd dros dro ar gyfer gwaith ffyrdd neu er mwyn osgoi perygl i'r cyhoedd.

These may last for 1 day and up to 18 months, with extensions available in certain circumstances.

Start dateDescriptionRoads affectedNotice
Friday 4 January 2019The maximum duration of the order is 18 months and it is anticipated the work will take 18 months to complete.

Notice - Temporary traffic restriction St Davids Place, City Centre

In order for City and County of Swansea Council, Parking Services Section to avoid stacking, associated congestion and resulting hazard in the City Centre.

Schedule - St Davids Place to Princess Way, City Centre

No right turn

Left turn only from St Davids Place into Princess Way.

The alternative route for vehicular traffic will be via Princess Way in north-westerly direction orbiting the roundabout at the bottom of Caer Street and returning via Princess Way in a south-easterly direction.

Monday 18 February 2019Until and including Tuesday 18 August 2020

Notice - Temporary footpath closure, Footpath LC40, Loughor

Will continue in force with the approval of the Welsh Government, until and including Tuesday 18 August 2020 or until such time as the works are completed, whichever is earlier.

The effect of such order is as shown in the schedule below. The closure is required to ensure the safety of the public whilst BDW Trading Ltd carry out construction vehicle movements across the footpath. It would have expired on Tuesday 18 February 2020.

Schedule

From the point where footpath 40 leaves Glebe Road adjacent to number 101 (Grid Reference 576980) in a southerly direction for approximately 531 metres or thereabouts to the point where footpath 40 intersects footpath no. 38 (Grid Reference 576976).

No alternative route will be available. 

Word Document Notice - Footpath LC40, Loughor (Word, 34KB)Yn agor mewn ffenest newydd
Tuesday 21 May 2019The maximum duration of the order is 18 months and it is anticipated the work will take 110 weeks to complete.

Notice - Proposed temporary road closure, Mariner Street, City Centre, Swansea

In order for ISG Construction to safely carry out demolition and construction works, it will be necessary to close Mariner Street to vehicular traffic on an intermittent basis.

Schedule

Mariner Street in a westerly direction from its junction with B4489 High Street to its junction with A4118 New Orchard Street, a distance of approximately 210 metres.

The alternative route for vehicular traffic will be via A4118 New Orchard Street, B4290 Alexandra Road and B4489 High Street.

This route will not operate in the opposite direction.

Access for emergency vehicles to be maintained at all times.

PDF Document 1st Notice Proposed temporary road closure, Mariner St (PDF, 274KB)Yn agor mewn ffenest newydd

PDF Document 2nd Notice Proposed temporary road closure, Mariner St (PDF, 274KB)Yn agor mewn ffenest newydd

Friday 9 August 2019 The maximum duration of the order is 18 months, it is anticipated that it will last 17 months 1 week

B4489 Wind Street, Swansea - temporary one-way order

In the interests of public safety and as a result of consultation with South Wales Police, it will be necessary to make the above street one way, prohibiting vehicular traffic travelling in a north-westerly direction from A4067 Victoria Road into B4489 Wind Street.  

Schedule

B4489 Wind Street from its junction Caer Street, in a south-easterly direction to its junction with A4067 Victoria Road, a distance of approximately 270 metres. 

The alternative route for vehicular traffic will be A4067 Victoria Road, B4290 Princess Way and Caer Street, a distance of approximately 650 metres.  Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document B4489 Wind Street, Swansea - temporary one-way order (PDF, 509KB)Yn agor mewn ffenest newydd

Monday 16 September 2019For 18 months and it is anticipated the work will take 9 weeks to complete.

Notice - Temporary road closure, Albert Row, City Centre

In order for Buckingham Group to carry out enabling works, it has been necessary to temporarily close Albert Row to vehicular traffic travelling in an eastbound direction.

Schedule

Albert Row in a north westerly direction from its junction with A4067 Oystermouth Road to its junction with Wellington Street, a distance of approximately 120 metres.

The alternative route for vehicular traffic will be A4067 Oystermouth Road (eastbound), Princess Way (northbound), orbiting the mini roundabout at Caer Street, Princess Way (southbound), A4067 Oystermouth Road (westbound), West Way and Wellington Street, a distance of approximately 1.5 kilometres.

Access for emergency vehicles to be maintained at all times.

PDF Document Notice and plan - Albert Row, Swansea (PDF, 1MB)Yn agor mewn ffenest newydd
Friday 13 December 2019For 18 months and it is anticipated the work will take 6 months to complete.

Notice - Temporary speed restriction, A48 Swansea Road (West and Eastbound), Penllergaer, Swansea

In order for City and County of Swansea Council, Operations Highways and Transportation Section to undertake footway works at the above location, it will be necessary, in the interests of safety, to temporarily introduce a 30mph speed restriction to vehicular traffic.

Schedule 1 - Temporary 30mph speed restriction A48 Swansea Road (Westbound), Penllergaer

A48 in a westerly direction from its junction with B4489 Swansea Road to its junction with A483 a distance of approximately 3 kilometres.

Schedule 2 - Temporary 30mph speed restriction A483 Swansea Road (Southbound), Penllergaer

A48 in an easterly direction from its junction with A483 to its junction B4489 Swansea Road, a distance of approximately 3 kilometres.

Access for emergency vehicles to be maintained at all times.

PDF Document Notice - A48 Swansea Road Penllerger, Speed restrictions (PDF, 2MB)Yn agor mewn ffenest newydd
Monday 6 January 2020For 18 months and it is anticipated the work will take 12 weeks to complete.

Notice - Temporary road closures, revocations and prohibitions, Union Street and Park Street, City Centre

In order for City and County of Swansea Council, Improvement Section to carry out enhancement works.

Schedule 1 - Temporary road closure Union Street (part)

Union Street in a south easterly direction from its junction with B4290 The Kingsway for a distance of approximately 48 metres.

Schedule 2 - Revocation of one-way Union Street (part)

Union Street in a north westerly direction from its junction with Oxford Street to its junction with Park Street, a distance of approximately 46 metres.

Vehicular traffic is prohibited.

Schedule 3 - Temporary road closure Park Street (part)

Park Street in a north easterly direction from its junction with Union Street to its junction with Portland Street, a distance of approximately 76 metres.

Schedule 4 - Revocation of contraflow cycle lane Park Street (part)

Park Street in a north easterly direction from its junction with Portland Street, a distance of approximately 42 metres.

The alternative route for cyclists will be Dillwyn Street and B4290 The Kingsway, a distance of 340 metres.

Schedule 5 - Revocation of blue badge parking Park Street (part)

Outside Portland House, rededicated as loading only.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Union Street and Park Street (PDF, 276KB)Yn agor mewn ffenest newydd
Monday 6 January 2020For 18 months.

Notice - Temporary road closure, Bus Lane, Civic Centre

In order for Buckingham Group to safely carry out construction works, it has been necessary to temporarily allow site vehicular traffic to utilise/share the bus lane.

Schedule

Bus Lane in a south westerly direction from its junction with A4067 Oystermouth road/West Way to its junction with A4067 Oystermouth Road/Glamorgan Street, a distance of approximately 400 metres.

Access for emergency vehicles to be maintained at all times.

PDF Document Notice and plan - Bus Lane, Civic Centre (PDF, 385KB)Yn agor mewn ffenest newydd
Monday 24 February 2020For 18 months and it is anticipated the work will take 48 weeks to complete.

Notice - Temporary road closure, Rear Service Lane, B4489 Castle Street, City Centre

In order for W.K. Plasterers Limited to undertake refurbishment of 15 to 20 Castle Street.

Schedule

Rear service lane rear of Castle Street between 15 to 20 Castle, a distance of approximately 120 metres.

There is no alternative route for vehicular traffic.

PDF Document 1st Notice and plan - Rear service lane, B4489 Castle Street (PDF, 164KB)Yn agor mewn ffenest newydd

PDF Document 2nd Notice and plan - Rear service lane, B4489 Castle Street (PDF, 164KB)Yn agor mewn ffenest newydd

Friday 17 April 2020for 5 months 1 week, it is anticipated the work will take 10 weeks to complete.

Notice - Temporary footway closure, St David's, City Centre

In order for Buckingham Group Contracting Limited to safely carry out demolition works.

Schedule

Pedestrian footway in a south westerly direction from its junction with St Mary's square to its junction with Thomas Street, a distance of approximately 80 metres.

The alternative route for pedestrian footfall will be Rutland Place, St David's Place, Princess Way, A4067 Oystermouth Road, Albert Row and Thomas Street, a distance of approximately 530 metres.

Access for emergency vehicles to be maintained at all times.

PDF Document 1st Notice and plan - Footway, St David's, City Centre (PDF, 300KB)Yn agor mewn ffenest newydd
Tuesday 2 June 2020

For 18 months, it is anticipated the work will take 25 months to complete*

*As a result, permissions will be sourced from Welsh Government to extend the order.

Notice - Temporary road closure, Bethesda Street, City Centre

In order for City and County of Swansea Council, External Funding Team to carry out renovation works to the Palace Theatre.

Schedule

Bethesda Street in a north-easterly direction from its junction with B4489 High Street to its junction with Prince of Wales Road, a distance of approximately 30 metres.

The alternative route for vehicular traffic will be via B4489 High Street and Prince of Wales Road, a distance of approximately 140 metres.

This route will operate in the reverse direction.

Access for emergency vehicles to be maintained at all times.

Word Document 2nd Notice - Bethesda Street, City Centre (Word, 22KB)Yn agor mewn ffenest newydd

PDF Document Bethesda Street - plan (PDF, 196KB)Yn agor mewn ffenest newydd

Monday 15 June 2020For a period of 21 days only (this notice will be extended by Order to
cover these works for 18 months).

Schedule - Temporary emergency road closure, Trewyddfa Road (Part), Morriston, Swansea

Trewyddfa Road in a north-easterly direction from its junction with Mynydd Garnllwyd Road to its
junction with Tan-Y-Lan Terrace, a distance of approximately 470 metres.

The alternative route for vehicular traffic will be via the Mynydd Garnllwyd Road, Caemawr Road and
Tan-Y-Lan Terrace, a distance of approximately 1.6 kilometres

Access for emergency vehicles and pedestrians to be maintained at all times.

Monday 15 June 2020For a period of 21 days only (this notice will be extended by Order to cover these works for 18 months).

Schedule 1 - Temporary road closure, Lon Cadog, Broadway

Lon Cadog in a south-westerly direction from its junction with Lon Caron to its junction with A4216, a
distance of approximately 320 metres.

The alternative route for vehicular traffic will be via Lon Caron, Lon Gwnfryn, Townhill Road and
A4216, a distance of approximately 550 metres.

Schedule 2 - Temporary prohibition of right turn Glanmor Road, Broadway

Prohibition in an easterly direction of right turn from A4216 Vivian Road to Glanmor Road.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Emergency TRO Notice - Broadway Scheme, Tycoch (PDF, 421KB)Yn agor mewn ffenest newydd
Monday 15 June 2020For 21 days only (or until the works are completed whichever is sooner, it is anticipated the work will take 5 days to complete)

Schedule - Temporary emergency road closure, Cadnant Road, Penlan

Cadnant Road in a north-westerly direction from its junction with Heol Frank to its junction with Heol
Gwyrosydd, a distance of approximately 70 metres.

The alternative route for vehicular traffic will be via Heol Frank, Peris Road, Conway Road and Heol
Gwyrosydd, a distance of approximately 480 metres.

Access for emergency vehicles and pedestrians to be maintained at all times.

Monday 22 June 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 1 day to complete.

Notice - Temporary road closure, A4118 Alexandra Road (part), City Centre

In order for Alun Griffiths Contractors to safely carry out traffic island construction works on behalf of Swansea Council.

Schedule

A4118 Alexandra Road in a north easterly direction from its junction with Pleasant Street to its junction with Orchard Street, a distance of approximately 170 metres.

The alternative route for vehicular traffic will be via A4118 New Orchard Street, A4118 Dyfatty Street, B4489 High Street and the unaffected section of B4290 Alexandra Road, a distance of approximately 1.4 kilometres.

Access for emergency vehicles and pedestrians to be maintained at all times.

Word Document Notice - A4118 Alexandra Road (part), City Centre (Word, 37KB)Yn agor mewn ffenest newydd

PDF Document A4118 Alexandra Road (part) - plan (PDF, 1MB)Yn agor mewn ffenest newydd

Monday 22 June 2020For 21 days only (or until the works are completed whichever is the sooner).

Notice - Temporary road closure, Highland Terrace, Pontarddulais

In order for Dwr Cymru Welsh Water to carry out emergency leak works on the above road.

Schedule

Highland Terrace from its junction with Goppa Road, in a northerly direction to its junction with Goppa Road, a distance of approximately 590 metres.

The alternative route for vehicular traffic will be via Goppa Road, a distance of approximately 570 metres.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

Word Document Notice - Highland Terrace, Pontarddulais (Word, 35KB)Yn agor mewn ffenest newydd

PDF Document Highland Terrace - plan (PDF, 980KB)Yn agor mewn ffenest newydd

Monday 22 June 2020For 21 days only (or until the works are completed whichever is the sooner).

Notice - Temporary road closure, Maesteg Street (part), St Thomas

In order for Dwr Cymru Welsh Water to carry out emergency leak works on the above road.

Schedule

Maesteg Street in a south easterly direction from its junction with A4217 Foxhole Road to its junction with St Elmos Avenue, a distance of approximately 70 metres.

The alternative route for vehicular traffic will be via St Elmos Avenue, Beaumont Crescent, Windmill Terrace and A4217 Foxhole Road, a distance of approximately 1 kilometre.

Similarly this route will operate in the reverse direction.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

Word Document Notice - Maesteg Street (part), St Thomas (Word, 35KB)Yn agor mewn ffenest newydd

PDF Document Maesteg Street (part), St Thomas - plan (PDF, 355KB)Yn agor mewn ffenest newydd

Monday 6 July 2020For 18 months. It is anticipated this temporary order will run until a permanent order has been agreed/sealed.

Notice - Temporary road closure, Broadway Scheme, Swansea

In order for Walter UK to safely carry highway improvement works on behalf of Swansea Council.

Schedule - temporary prohibition of right turn, Glanmor Road, Broadway

Prohibition in an easterly direction of right turn from A4216 Vivian Road to Glanmor Road.

Access for emergency vehicles and pedestrians to be maintained at all times.

Word Document 2nd Notice Broadway Scheme, Swansea (Word, 22KB)Yn agor mewn ffenest newydd

PDF Document 1st Notice Broadway Scheme, City Centre - plan (PDF, 372KB)Yn agor mewn ffenest newydd

Monday 6 July 2020For 18 months. It is anticipated the work will take 4 weeks to complete.

Notice - Temporary no right turn, Gors Avenue, Cwmbwrla

In order for City and County of Swansea Council, Telematics Section to safely undertake telemetry improvement works at the above location.

Schedule

No right turn in a south easterly direction from Gors Avenue onto A483 Carmarthen Road.

The alternative route for vehicular traffic will be via A483 Carmarthen Road (northbound) orbiting Cwmbwrla roundabout and A483 Carmarthen Road (southbound), a distance of approximately 650 metres.

Access for emergency vehicles to be maintained at all times.

Word Document 2nd Notice Gors Avenue, Cwmbwrla (Word, 22KB)Yn agor mewn ffenest newydd

PDF Document Gors Avenue - plan (PDF, 337KB)Yn agor mewn ffenest newydd

Monday 6 July 2020For 18 months. It is anticipated the work will take 72 weeks to complete.

Notice - Temporary road and footway closure, Hill View Crescent, Clase, Swansea

In order for Swansea Council, Building Services to safely carry out development works at the above location.

Schedule 1 - temporary road closure Hill View Crescent, Clase

Hill View Crescent in a south-westerly direction from its junction with Long View Road to its junction with Long View Road, a distance of approximately 300 metres.

The alternative route for vehicular traffic will be via Long View Road, a distance of approximately 170 metres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles and residents to be maintained at all times.

Schedule 2 - temporary footway closure Hill View Crescent, Clase

Hill View Crescent footway (no right turn) in a north easterly direction from the point that the footway meets its juncture with footway running from Beaconsview Road.

The alternative route for pedestrian footfall will be via the unaffected section of Hill View Crescent, Long View Road and again via the unaffected section of Hill View Crescent, a distance of approximately 380 metres.

Access for emergency vehicles to be maintained at all times.

PDF Document 1st Notice and plan Hill View Crescent, Clase (PDF, 537KB)Yn agor mewn ffenest newydd
Tuesday 7 July 2020For 18 months. Initial investigation works will take place from Tuesday 7 July to 14 July 2020 (road will then reopen) and will then be fully closed again for the full refurbishment works, between Tuesday 10 November 2020 and Monday 12 April 2021

Notice - Temporary road closure, B4296 Pentre Road (part), Grovesend, Swansea

In order for Network Rail to undertake a survey and subsequent refurbishment works on B4296 Pentre Road, Grovesend Railway Bridge.

Schedule

B4296 Pentre Road in a north easterly direction from its junction with Heol Y Mynydd to its junction with A48 St Teilo Street/A48 Bolgoed Road, a distance of approximately 4 kilometres.

The alternative route for vehicular traffic will be via A48 Bolgoed Road, A48 Bryntirion Road, A48 Swansea Road, A4240 Gorseinon Road, Heol Y Mynydd, B4296 Pontarddulais Road, B4296 Coalbrook Road, B4296 High Street and the unaffected section of B4296 Pentre Road, a distance of approximately 9 kilometres.

Similarly this route will work in the opposite direction.

Access for pedestrians and cyclists to be maintained at all times.

PDF Document 1st Notice and plan B4296 Pentre Road (part) Grovesend (PDF, 9MB)Yn agor mewn ffenest newydd
Wednesday 8 July 2020For 21 days only (or until the works are completed whichever is the sooner). It is anticipated the work will take 3 days to complete.

Notice - Emergency temporary road closure, Burrows Lane, Llangennith, Swansea

In order for Morrison Utility services to carry out mains remedial works on behalf of Dwr Cymru/Welsh Water.

Schedule

Burrows Lane in a northerly direction from its junction with Moor Lane for a distance of approximately 1.2 kilometres.

There is no alternative route for vehicular traffic*.

*Steel plates will be used if access and egress is required.

Access for emergency vehicles, pedestrians and residents to be maintained at all times.

PDF Document Notice and plan - Burrows Lane, Llangennith (PDF, 315KB)Yn agor mewn ffenest newydd
Thursday 9 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 1 day to complete.

Notice - Temporary road closure, Mayals Green, Mayals, Swansea

In order for HTI Installations Limited to carry out poling works at the above location.

Schedule

Mayals Green in a north easterly direction from its junction with Fairwood Road to its junction with B4436 Mayals Road, a distance of approximately 270 metres.

The alternative route for vehicular traffic will be via B4436 Mayals Road and Fairwood Road, a distance of approximately 550 metres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Mayals Green, Mayals, Swansea (PDF, 296KB)Yn agor mewn ffenest newydd
Thursday 9 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 1 day to complete.

Notice - Temporary road closure, Village Lane, Mumbles

In order for HTI Installations Limited to carry out ducting works at the above location.

Schedule

Village Lane in a north-easterly direction from its junction with Thistleboon Road, to its junction with B4433 Mumbles Road, a distance of approximately 145 metres.

The alternative route for vehicular traffic will be via Thistleboon Road, New Villas, Plunch Lane, Mumbles Road and B4433 Mumbles Road, a distance of approximately 2.7 kilometres.

This route will not operate in the reverse direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Village Lane, Mumbles (PDF, 1010KB)Yn agor mewn ffenest newydd
Friday 10 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 1 day to complete.

Notice - Temporary road closure, Caswell Road and Caswell Bay Road, Caswell

In order for HTI Installations Limited to carry out poling works at the above location.

Schedule

Caswell Road (part) and Caswell Bay Road in a north westerly direction from property Grey Cliffs to Pyle Road/Oldway, a distance of approximately 900 metres.

The alternative route for vehicular traffic will be via Oldway, Manselfield Road, Murton Lane, Woollacott Drive, Summerland Lane, Long Shepherds Drive, Caswell Drive B4593 Caswell Road, and the unaffected section of Caswell Road, a distance of approximately 4.8 kilometres.

Similarly, this route will operate in the reverse direction.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Caswell Road and Caswell Bay Road (PDF, 1MB)Yn agor mewn ffenest newydd
Sunday 12 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 1 day to complete.

Notice - Temporary road closure, Gower Place, Mumbles, Swansea

In order for HTI Installations Limited to carry out ducting works at the above location.

Schedule

Gower Place in a south westerly direction from Gloucester Place to Chapel Street, a distance of approximately 90 metres.

The alternative route for vehicular traffic will be via Dunns Lane, B4433 Mumbles Road, B4693 Newton Road and Chapel Street, a distance of approximately 600 metres.

No access/egress to/from Chapel Street when works are carried out at their junction with Gower Place.

This route will operate in the opposite direction and is suitable for light vehicles only.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Gower Place, Mumbles, Swansea (PDF, 400KB)Yn agor mewn ffenest newydd
Monday 13 July 2020For 18 months. It is anticipated the work will take 16 weeks to complete.

Notice - Temporary one way order, Eaton Crescent, Uplands

In order for Wales and West Utilities to carry out gas mains replacement works.

Schedule 1 - temporary one way order, Eaton Crescent, Uplands

Eaton Crescent in a south westerly one way direction from its junction with A4118 Uplands Crescent/Walter Road to its junction with Brynymor Road/Brynymor Crescent, a distance of approximately 900 metres.

Schedule 2 - revocation of left turn Service Lane, Uplands

No left turn egress from service lane.

Schedule 3 - revocation of left turn Bonville Terrace, Uplands

No left turn egress from Bonville Terrace.

Schedule 4 - revocation of right turn The Cloisters, Uplands

No right turn egress from The Cloisters.

Access for emergency vehicles to be maintained at all times.

PDF Document 1st Notice and plan - Eaton Crescent, Uplands, Swansea (PDF, 777KB)Yn agor mewn ffenest newydd
Monday 13 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 2 days to complete, however these works are weather dependent.

Notice - Temporary road closure, Hermon Lane and Caban Isaac Road, Penclawdd

In order for Swansea Council, Planned Maintenance Section to undertake resurfacing works at the above location.

Schedule

Hermon Lane and Caban Isaac Road in a north westerly direction from their junction with Llanymewydd to the junction of B4295 The Promenade, a distance of approximately 2 kilometres.

The alternative route for vehicular traffic will be via B4295 The Promenade, B4295 West End, Victoria Road and the unaffected section of Caban Isaac Road, a distance of approximately 2.3 kilometres.

This route is only suitable for light vehicles.

Access for emergency vehicles to be maintained at all times.

PDF Document Notice and plan - Hermon Lane and Caban Isaac Road, Penclawdd, Swansea (PDF, 1MB)Yn agor mewn ffenest newydd
Monday 13 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated that the works will take 5 days to complete, these works are weather dependent.

Notice - Temporary road closure, Llannant Road, Penyrheol, Swansea

In order for Swansea Council, Planned Maintenance Section to undertake resurfacing works at the above location.

Schedule

Llannant Road in a north westerly direction from its junction with Pen-Cefn-Arda Road for a distance of approximately 900 metres.

No access/egress from Gower View Road whilst works are underway at its junction with Llannant Road.

There is no alternative route for vehicular traffic.

Access for emergency vehicles to be maintained at all times.

PDF Document Notice and plan - Llannant Road, Penyrheol, Swansea (PDF, 612KB)Yn agor mewn ffenest newydd
Monday 13 July 2020For 21 days (or until the works are completed whichever is the sooner, works are anticipated to last 12 days until 25 July 2020).

Emergency notice - Temporary traffic regulation, Christina Street, A4118 Mansel Street, Cradock Street, A4118 Mansel Street, A4118 Grove Place, B4290 Alexandra Road, A4118 New Orchard Street, Bell Vue Way, B4290 The Kingsway, Portland Street, Park Street and College Strett, City Centre

In order for City and County of Swansea Council, Improvement Section to carry out enabling and resurfacing works.

Schedule

Roads closed

Roads affected Christina Street (full length), A4118 Mansel Street (Page Street to Cradock Street), A4118 De La Beche Street (full length).

Roads affected A4118 De La Beche (full length), Mount Pleasant Hill (no access onto Grove Place), A4118 Grove Place (Mount Pleasant Hill to Pleasant Street), Belle Vue Way (full length).

Access to the police station will be maintained via Belle Vue Way, however dependent upon where particular works may be being undertaken this will vary during the evening as to which entrance / exit is maintained. Traffic Marshalls will be provided at the junction of Belle Vue Way and the Kingsway to provide access and request that any emergency vehicle requiring access provides advance notice of its intention by its vehicle indicators and blue lights.

Daytime lane closures on A4118 De La Beche. Single lane open for all traffic.

Daytime lane closures on A4118 De La Beche. Single lane open for all traffic.

Roads affected A4118 Alexandra Road (Pleasant Street to Orchard Street), A4118 New Orchard Street (full length), A4118 Alexandra Road (Orchard Street to High Street). Pleasant Street will remain open to traffic.

Due to these works being weather dependent, confirmation of the actual closure, locations times and dates will be issued and communicated when agreed.

Access for emergency vehicles and pedestrians to be maintained at all times.

Word Document Emergency Notice - Various Roads Swansea City Centre (Word, 51KB)Yn agor mewn ffenest newydd
Tuesday 14 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 3 days to complete (9.00am onwards).

Notice - Temporary road closure, B4291 Birchgrove Road (Heol Ddu/Slip), Birchgrove

In order for T Richard Jones (Betws) Ltd to safely carry out construction works.

Schedule

B4291 Heol Ddu in an easterly direction from its junction with A4230 Peniel Ggreen Road (Junction 44 M4/Birchgrove roundabout) to its junction with B4291 Birchgrove Road, a distance of approximately 200 metres.

The alternative route for vehicular traffic will be via B4291 Birchgrove Road and A4230 Peniel Green Road, a distance of approximately 1.1. kilometres.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - B4291 Birchgrove Road (Heol Ddu/Slip), Birchgrove (PDF, 597KB)Yn agor mewn ffenest newydd
Thursday 16 July 2020For 5 days (or until the works are completed whichever is the sooner). It is anticipated the works will take 3 days to complete.

Notice - Temporary road closure, Nottage Road, Newton, Swansea

In order for HTI Installations Ltd to carry out duct works at the above location.

Schedule 1 - temporary road closure Nottage Road, Newton

Nottage Road in a south-westerly direction from its junction with Southward Lane to its junction with Nottage Mews, a distance of approximately 180 metres.

The alternative route for vehicular traffic will be via Southward Lane and B4593 Caswell Road, a distance of approximately 500 metres.

Schedule 2 - temporary revocation of one-way Nottage Road, Newton

To allow access and egress from B4593 Caswell Road for residents only.

Access for emergency vehicles and pedestrians to be maintained at all times.

PDF Document Notice and plan - Nottage Road, Newton, Swansea (PDF, 414KB)Yn agor mewn ffenest newydd

  

 

Wedi'i bweru gan GOSS iCM